Documents Required For Building Plan Approval In Bangalore

By Admin | August 9, 2024

Documents Required For Building Plan Approval In Bangalore

To ensure the safety and compliance of building constructions, the Bruhat Bengaluru Mahanagara Palike (BBMP) has implemented specific guidelines and requirements for obtaining building plan approval in Bangalore. Submitting the necessary documents is crucial for a smooth and efficient approval process. Here are the essential documents required:

1.

Building Plan and Drawings:

  • Six copies of the architectural drawings, including floor plans, elevations, sections, and site plans.
  • Drawings must be prepared by an authorized architect and bear their seal and signature.

2.

Ownership Documents:

  • Original sale deed or registered lease deed of the property.
  • Proof of identification (Aadhaar card, voter ID, passport).
  • Khata Extract and Mutation Extract.

3.

NOCs (No Objection Certificates):

  • From Fire Department.
  • From Bangalore Water Supply and Sewerage Board (BWSSB).
  • From Bangalore Electricity Supply Company (BESCOM).
  • From Traffic Police if the building is located on a main road.

4.

Structural Stability Certificate:

  • Structural design calculations and drawings prepared by a registered structural engineer.
  • Certificate of structural stability issued by the engineer.

5.

Soil Investigation Report:

  • Report on the soil bearing capacity and other relevant soil properties at the construction site.
  • The report should be prepared by a recognized geotechnical engineer.

6.

Environmental Clearance (if applicable):

  • Required for projects that may have a significant impact on the environment.
  • Obtained from the Karnataka State Pollution Control Board.

7.

Other Documents:

  • Declaration of ownership.
  • Power of attorney (if applicable).
  • Property tax receipts.
  • Building fee challan receipt.

It is essential to ensure that all documents are complete, accurate, and submitted in the prescribed format. Incomplete or insufficient documentation can delay or even result in the rejection of the building plan application. It is advisable to consult with qualified professionals, such as architects, engineers, and legal advisors, to assist in the preparation and submission of the required documents. By fulfilling the document requirements and adhering to the guidelines, property owners can streamline the building plan approval process and ensure that their construction projects meet the necessary standards and regulations.


Plan Sanction In Bangalore Building Approval Bmrda Bda Bbmp

Untitled

How Do I Take Bbmp Plan Approval For Constructing A House On 15 400

Plan Sanction In Bangalore Building Approval Bmrda Bda Bbmp

Royallinks House Construction Approval Assistance

Construction Company Vs Contractors Top House In Bangalore Building Commercial And Services Your Budget

Documents Required For Residential Building Plan Approval Gangadharcm Successloka

Documents Required For Residential Building Plan Approval Gangadharcm Successloka

Building Plan Approval Process In Bangalore Bbmp Bda Panchayat Limits Bwssb Bescom New Water Electricity Connections Approvals 100pillars Constructions

Information Technology Department Bbmp

Building Plan Process In Bangalore


Leave a Reply

Your email address will not be published. Required fields are marked *